Langsung ke informasi produk
1 dari 5

lianbang-solar

Solar installation accessories, solar panel system, solar panel installation structure, track

Solar installation accessories, solar panel system, solar panel installation structure, track

Harga reguler $1.80 USD
Harga reguler Harga obral $1.80 USD
Obral Habis
Biaya pengiriman dihitung saat checkout.

  Solar installation accessories play a crucial role in ensuring the efficiency and durability of solar panel systems. These accessories include various components such as mounting structures, rails, bolts, clamps, and tracks, which are essential for securely installing solar panels on rooftops or ground-mounted systems.

Brand Name LB-002
Material Science Aluminum and stainless steel
standard AS/NZS 1170
Wind load 130mph = 60m/s
Snow load 1.4 KN/m ²
Applicable modules Frame or frameless
surface treatment anodic oxidation 
application Solar rooftop photovoltaic installation system
size customized
guarantee 10-year warranty, 25 year service life
Supply capacity Installing brackets exceeding 10 megawatts per week

 

Company& Workshop

  Xiamen Lianbang Technology Co., LTD is a forward-thinking provider of integrated low-carbon energy solutions. We specialize in energy development, offering a comprehensive range of services including design, investment, construction, operation and maintenance, as well as technical consulting. Our expertise spans the fields of integrated and distributed energy systems.

  With years of rich experience in EPC (Engineering, Procurement, and Construction) general contracting for power and electromechanical engineering projects, we apply advanced technology and engineering management to green energy initiatives. This allows us to deliver full-service solutions that meet the diverse needs of our clients.


Engineering case

 

Package Information

In well protected carton or wooden box with pallets.

FAQ


Q : Can I have a sample order ?

A : Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.


Q : What about the lead time?

A : Sample needs 3-5 days, mass production time needs 15~30 days for order quantity more than.


Q : Do you have any MOQ limit ?

A : For normal products, we provide low MOQ, 1pc for sample checking is available.

 

Q : What service we can offer ?

A : We provide free design services, installation technical guidance, and maintenance services.

 

Q : How do you ship the goods and how long does it take to arrive?

A : For small products, we usually ship by DHL, UPS, FedEx or TNT. It usually takes 7-15 days to arrive. For big orders, we usually ship by sea, it will take 7~30days to arrive, depend on distance.


Q : How to proceed an orders?

A : Firstly let us know your requirements or application. Secondly We quote according to your requirements or our suggestions. Thirdly customer confirms the samples and places deposit for formal order.

 

Lihat detail lengkap